Every stop with its time, duration and cause, and an OEE you can explain.

Shift A · every stop with cause and durationillustrative example
07:0011:0015:00
Availability
86 %
69 min stopped
Performance
89 %
vs standard
Quality
96 %
good product

OEE = availability × performance × quality = 74%

The problem

Short stops go unrecorded, but they add up

A five-minute jam at the fryer exit doesn't seem important. Repeated several times a shift, it's lost output nobody can explain or tackle, because it was never recorded.

In validation on the plant floor

Sound familiar?

  • The downtime log only has the long stops.
  • Causes are written from memory at the end of the shift.
  • OEE, if it exists, is a number nobody can break down.
  • Maintenance and production argue about why the line stopped.

What we ask first

Before proposing anything, we understand what happens on your line today.

  • When the line stops, who finds out and how long does it take?
  • Where is a five-minute stop recorded?
  • Who decides the cause and who fixes it?
  • Do you know today which stop cause costs you the most time per month?

How we approach it

We detect the stop from the real product flow or from a machine signal. The system records start and duration automatically; the supervisor only confirms the cause.

  1. 1. We define what counts as a stop

    How many seconds without product count as a stop, and which stops are planned (changeovers, cleaning).

  2. 2. We record the stop on its own

    Start time and duration are logged without anyone writing anything.

  3. 3. We confirm the cause on the floor

    The supervisor picks the cause from a list agreed with your team, on a tablet or phone.

  4. 4. We break down OEE

    Availability, performance and quality by line, shift and product, each with its source.

What it takes

Software

  • Automatic stop log with a cause list
  • OEE calculation by line, shift and product
  • Downtime analysis by cause
The full platform →

Plant equipment

  • The line's existing counting source (camera or machine signal)
  • Tablet or phone to confirm causes
How we select hardware →

If the line already has a run/stop signal it can be used; if not, stops are detected from product flow. This is defined during technical design.

Who uses the information

Shift supervisor
Confirms causes while the stop is still fresh.
Maintenance
Sees which equipment stops most and for how long.
Plant manager
Knows which cause cost the most time this week.
Continuous improvement
Chooses the next problem to tackle with data.

Decisions it supports

  1. 01Which stop cause to tackle first.
  2. 02Whether a problem is equipment, material or method.
  3. 03When to schedule preventive maintenance on critical equipment.
  4. 04How to plan changeovers to lose less time.

How value is measured

We measure before and after, on your line. Value is shown with your data, not promises.

Unplanned stop minutes per shift
Baseline measured in the first weeks and compared after each action.
Stops without a recorded cause
Share of stops with a confirmed cause, week by week.
OEE and its three components
Calculated with the same rule before and after.
Estimate the value of this problem

Let's start with one problem.

Tell us what's costing you most today. We review it with you, show how we'd solve it and estimate its value together.